Highlights of the Tamar Project include:
- Largest natural gas discovery in the world in 2009
- When constructed, the longest subsea tieback in the world (150 km)
- 457 miles/735 km of line pipe. Installed weight of over 108,000 tons
- Over 1,200 miles/1,900 km of umbilical tubing used
- Total of 60,000 welds made during the installation of the offshore pipeline
- Deep diving work performed at 240m water depth utilizing 80 divers